top of page

Book in at the Boatyard

Complete our simple haul out request form and one of our team will be in touch with confirmation of your booking. 

If you require any support please do not hesitate to contact us 

 

Marina & Boatyard Terms & Conditions 

Vessel details

Vessel Type
Sailing Yacht
Launch
Sports Fisher
Multi-Hull
Power Cat
Bilge Keeler
Other

If you are a yacht with a LOA over 12.2m

You may need to remove the forestay or enter stern first if there are no protrusions above 5.7m from the ground. in some circumstances, the backstay may need to be removed. This must be done prior to arriving for your haul out.

Preferred Time
Morning
Afternoon

Service Required

Requested Boatyard Services
Additional or Short Slings Required?
Short Slings
Extra Slings

Paintshop Services

Requested Paintshop Services
I have proof of Third Party Liability Insurance
YES
NO

PLEASE NOTE - It is important to mark the fore and aft positions for the slings to lift the boat.

Acknowledgement

  • Navigation of the vessel remains at all time the sole responsibility of the skipper and the skipper is responsible for determining the lifting positions

  • For all sailing vessels with a LOA exceeding 40ft or vessels with a bowsprit, the forestay will need to be removed. A stern entry may be considered please discuss with the boatyard office.

  • Drop Sheets are required for all sanding, scraping and painting activities

  • NO GRINDING, WELDING, SAND BLASTING or WATER BLASTING - Requires management approval and by approved contractors only.

  • Wet sanding is not allowed. Dry sanding is permitted only when using approved sanding equipment with a vacuum attachment.

  • Working at height - Ladders are not to be used as a work platform. All scaffolding used in the boatyard must be well maintained and meet NZ regulations

  • Ladders - Only approved ladders to be used and secured to the boat at the top by boatyard staff.

  • Cradles and Props must not be tampered with. Only boatyard staff are authorised to move them

  • HOT WORKS (grinding, welding etc.), CRANE/HI-AB operations, Spray Painting and sand blasting are notifiable activities and are subject to permit approval by management prior to commencing work

bottom of page